What does the CM at Risk model allow for in terms of project design?

Prepare for the Certified Construction Manager Test. Study with flashcards and multiple-choice questions. Each question comes with hints and explanations to boost your readiness. Ace your exam with ease!

The CM at Risk model is designed to foster collaboration between the contractor and the design team throughout the project lifecycle. By facilitating contractor input on design alternatives, this model allows for a more innovative approach to project delivery. Contractors bring practical knowledge and experience, which can lead to improved efficiency and reduced costs. This collaborative environment enables adjustments to be made during the design phase based on constructability, scheduling, or budget considerations, enhancing the overall outcome of the project. The input from the contractor can lead to valuable insights that optimize the design before the construction phase begins, ultimately benefiting the project as a whole.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy